The Wanderer Photo Gallery

Email your photos to support@wanderer.com

Mattapoisett Bike Path
Planking for the bike path is under test review, and the installation of railings along the elevated sections of railings can be seen from the Reservation Road portion of Phase 1b of the Mattapoisett Bike Path. Town Administrator Mike Lorenco said that although a different type of planking material is being tested, the town will not accept the project for ownership until MassDOT enters into a joint-ownership agreement and/or provides bonding assurances in the event of material failure as previous experience

Mattapoisett Bike Path

Planking for the bike path is under test review, and the installation of railings along the elevated sections of railings can be seen from the Reservation Road portion of Phase 1b of the Mattapoisett Bike Path. Town Administrator Mike Lorenco said that although a different type of planking material is being tested, the town will not accept the project for ownership until MassDOT enters into a joint-ownership agreement and/or provides bonding assurances in the event of material failure as previous experience

GoogleEarthHeart.jpg Ukraine_031022_Casi.jpg BikePath-102022_0148.jpg Howard-Tinkham-Parade-112322-14_55_23-2.jpg SLT-Osprey-Boardwalk_0202.jpg
Rate this file (No vote yet)