One of the obstacles in the next leg of the Rail Trail is the Eel Pond inlet which will need to be bridged. The Friends of the Bike Path (Mattapoisett) will be holding a meeting on February 28 at 6:30pm at the Mattapoisett Library to go over the bike path progress.