On September 22, a construction crew continues to work on dislodging a house on Wilber’s Point in Fairhaven. The house will be loaded onto a barge and floated over Buzzard’s Bay to its new location on Brant Beach Ave. in Mattapoisett. Since tides and winds are critical to safely moving the house, the move has been rescheduled several times. Photo by Anne O’Brien-Kakley
Rate this file (Current rating : 3 / 5 with 9 votes)